GCC Models in India: Captive vs BOT vs Third-Party.
How a captive centre, a build-operate-transfer model and a third-party vendor compare on control, IP, tax and exit for a global capability centre in India.
Question about this note? Ask a partner on WhatsApp
A global capability centre in India can be run three ways: as your own captive subsidiary, through a build-operate-transfer arrangement where a partner sets it up and hands it over, or through a third-party vendor. Choose a captive when the work is core and long-term, a BOT when you want a captive eventually but need a partner to start, and a vendor when the work is variable or you are testing India. Advisory Monks Consulting advises on the entity, tax and transfer-pricing side of each route.
On this page
How do the three models compare?
| Factor | Captive subsidiary | Build-operate-transfer | Third-party vendor |
|---|---|---|---|
| Who employs the team | Your Indian subsidiary | The partner at first, then your subsidiary | The vendor |
| Control over people and IP | Full | Contractual at first, full after transfer | Contractual |
| Indian entity needed | Yes, from the start | At or before transfer | No |
| Transfer pricing | Your subsidiary's margin must be at arm's length | Applies once you own the entity | Usually not, as the vendor is unrelated |
| Exit or scale-down | Wind down or sell your entity | Set by the transfer terms | Set by the contract |
When does BOT make sense?
BOT suits a company that wants its own centre but lacks hiring and operating capacity in India at the start. The contract should fix the transfer trigger, how employees and assets move, how IP created before transfer is owned, and how the transfer is priced. Those terms decide the tax and FEMA steps at handover, so draft them with the end structure in mind.
What are the tax and FEMA points?
A captive is usually a wholly owned subsidiary funded by the parent, so the share issue is reported in Form FC-GPR within 30 days and the subsidiary files an annual Foreign Liabilities and Assets return by 15 July. Its services to the parent are related-party transactions, so the margin must be at arm's length and documented each year. Our note on GCC setup and transfer pricing covers the pricing in detail, and GCC vs outsourcing compares the captive with a vendor.
How long does a captive take to set up?
For a captive centre we plan on 10 to 16 weeks end to end: incorporation in 4 to 8 weeks, then GST and tax registrations and bank and operations set-up of about 3 to 4 weeks each. A vendor can start sooner because no entity is needed.
Frequently asked questions
Is a BOT cheaper than a captive?
It depends on the partner's fees and the transfer price. A BOT saves early set-up effort, but you pay for that through the contract, so compare total cost over the period you expect to run the centre.
Who owns the IP in a BOT before transfer?
Whatever the contract says. Set out in writing that IP created for you belongs to you from the start, and how it moves at transfer.
Does a captive need transfer-pricing documentation?
Yes. Its services to the parent are related-party transactions, so the margin and method must be documented and reported each year.
How Advisory Monks Consulting helps
We set up the entity, design the transfer-pricing model and run the compliance calendar. Engagements start with a 20-minute diagnostic that ends in a written scope and a fixed monthly fee on one of three retainer tiers: Essentials, Growth or Institutional, with the fee shared within one working day. See our GCC India practice.
This note is general information, not legal or tax advice. Confirm the transfer-pricing and FEMA rules against the official text before acting.
This note is general guidance, not tax or legal advice. Positions depend on your specific facts — speak with a partner before acting.
Does this apply to your situation? Ask a partner directly. A short message is enough to start.